Join us.Take part in the Program.
20. Object composition.
The cost of Object will consist of:
1. Residual value of objects on the territory
the concession.
2. Cost of developing of new production
capacity.
3. Value of the concession.
4. The cost of creating recreation areas on the
territory of the concession.
1. The residual value of objects on the
territory the concession:
1.1. DP "Potash plant" JSC
"Oriana" (buildings and structures), fixed assets.
1.2. Dombrowski quarry.
1.3. Mine "Kalush."
1.4. Mine "Holyně."
1.5. Mine "Novo-Holyně."
1.6. Two blade saline soils.
1.7. Two tailing dump.
1.8. Accumulator sludge.
1.9. Magnesium Plant.
1.10. Access roads and communication.
1.13. Territory production related materials.
1.16. Object area guarded perimeter.
2. New production recycling brines in the
following composition.
2.1. Production preparation and filing of
brines on the production with functions:
2.1.1. Monitoring of ecological situation
concession area.
2.1.2. Reconstruction hydraulic structures
Object.
2.1.3. Planning, preparation and fence brines.
2.1.4. Brine in the production, analysis and
filtering characteristics of the brine.
2.1.5. Reconstruction of the concession area (4
of this list) in the area of recreation.
2.2. Production recycling of brines in the
following composition.
2.2.1. Recycling brines.
2.2.2. Experimental production and operation of
process equipment.
2.2.3. Production related materials (as
appropriate).
2.2.4.
2.2.4. Motor company.
2.2.5. Production of magnesium metal -
Magnesium Plant.
2.2.6. Alternative energy company -
incineration of municipal solid waste and liquid composite fuel.
3. The concession.
4. Construction of recreation areas on the
territory of the concession.
Join us.Take part in the Program.
We would welcome your help in editing English pages on our site.