18. Designing.
The total costs of the design is about $ 53.97
million
Stage of "0“. Development of baseline data for the design
and preparation is performed by:
- Scientific and practical task of checking the
input and output parameters of the known processes aggregates A1-10;
- Substantiates parameters created by
interfacing at this stage of communication protocols;
- Gives technical the design assignment.
Cost: about 15% of design work - about $ 5.82
million Duration: about 6-12 months.
Stage of "1". Feasibility study of investment
Stage of includes all planned economic
characteristics, the basic structure and Plans equipment (analog full
conceptual design).
Cost: about 15% of design work - from $ 5.82
million Date of performance works 6-12 months.
Stage of "2". Project.
Stage of provides a complete documentation of
all sections without detailing.
Cost: about 40% of R & D - from $
15,530,000.
Stage of "3". Working documents (RD).
Stage of contains detailing design and
engineering documentation required for use in the production of a particular
manufacturer's equipment.
Cost: about 30% of R & D - from $ 11.65
million.
Finalization of project documentation and
modernization.
In practice, the development and implementation
of a sophisticated new high technology equipment is accompanied by the process
of adjustments and refining equipment documentation.
Finalization of the documentation:
- Aggregate condition A0 to A1 - will be about
30% of the cost of designing A0 - $ 11.65 million;
- Unit A1 to A2 condition - will be about 30%
completion of design documentation A1 - $ 3.5 million.