We would welcome your help in editing English pages on our site.

Join us.Take part in the Program.

18. Designing.

The total costs of the design is about $ 53.97 million

Stage of "0“. Development of baseline data for the design and preparation is performed by:

- Scientific and practical task of checking the input and output parameters of the known processes aggregates A1-10;

- Substantiates parameters created by interfacing at this stage of communication protocols;

- Gives technical the design assignment.

Cost: about 15% of design work - about $ 5.82 million Duration: about 6-12 months.

Stage of "1". Feasibility study of investment

Stage of includes all planned economic characteristics, the basic structure and Plans equipment (analog full conceptual design).

Cost: about 15% of design work - from $ 5.82 million Date of performance works 6-12 months.

Stage of "2". Project.

Stage of provides a complete documentation of all sections without detailing.

Cost: about 40% of R & D - from $ 15,530,000.

Stage of "3". Working documents (RD).

Stage of contains detailing design and engineering documentation required for use in the production of a particular manufacturer's equipment.

Cost: about 30% of R & D - from $ 11.65 million.

Finalization of project documentation and modernization.

In practice, the development and implementation of a sophisticated new high technology equipment is accompanied by the process of adjustments and refining equipment documentation.

Finalization of the documentation:

- Aggregate condition A0 to A1 - will be about 30% of the cost of designing A0 - $ 11.65 million;

- Unit A1 to A2 condition - will be about 30% completion of design documentation A1 - $ 3.5 million.

To previous

Read more.

At the start of the document. 

Join us.Take part in the Program.

We would welcome your help in editing English pages on our site.

Create your website or online store with Mozello

Quickly, easily, without programming.

Report abuse Learn more